{"id":5685,"date":"2025-02-03T12:04:25","date_gmt":"2025-02-03T10:04:25","guid":{"rendered":"https:\/\/blog.claritee.io\/?p=5685"},"modified":"2025-02-03T12:07:33","modified_gmt":"2025-02-03T10:07:33","slug":"the-visual-planning-guide-how-to-save-time-and-money-on-design-projects-with-rapid-sketching-sitemapping","status":"publish","type":"post","link":"https:\/\/claritee.io\/blog\/the-visual-planning-guide-how-to-save-time-and-money-on-design-projects-with-rapid-sketching-sitemapping\/","title":{"rendered":"The Visual Planning Guide: How to Save Time and Money on Design Projects with Rapid Sketching & Sitemapping"},"content":{"rendered":"\n

Why Most Design Projects Waste Time and Money<\/strong><\/h3>\n\n\n\n

You think design projects get expensive because of the work itself<\/strong>. But the real<\/strong> cost comes from endless revisions, misalignment, and late-stage changes.<\/p>\n\n\n\n

The problem? Most projects start with text-based plans that don\u2019t match how design actually works.<\/strong><\/p>\n\n\n\n